NIO battery swapping exchanges a compatible vehicle’s battery pack; BaaS is the separate subscription arrangement for using a battery. Neither a large network nor a new partnership makes every vehicle compatible. NIO’s September 28, 2026 release reports 4,126 Power Swap Stations in China using a September 27 snapshot. That is different from its combined charging-and-swapping total.
Updated November 9, 2026: Added firefly’s 60 kWh permanent-upgrade option, the fifth-generation station boundary and a route-planning checklist using dated manufacturer releases. Earlier network totals and transaction terms retain their September dates; no new November network total or transaction closing is asserted.
Cover: Official NIO Power Swap Station product visualization from NIO; editorial crop and typography by BYDToday. Illustrative station context, not proof of September 2026 deployment, a fifth-generation specification or universal vehicle compatibility. No AI-generated scene.
On this page: swap timing · network figures · Geely partnership · BaaS checklist.
What does NIO’s three-minute swap claim cover?
The official NIO Power page describes a fully automatic swap with a battery and electric-drive health check. Its footnote defines the timed process as starting when the car is in ready-for-power-swap mode and ending when the self-check is finished. It should not be described as only the mechanical battery exchange.
A driver’s journey is longer than that timed process. Finding the entrance, reaching an available bay and waiting for service are separate practical questions. Before relying on swapping for a regular trip, check the operator’s current vehicle/site listing and service availability, then keep a charging alternative. This is BYDToday’s planning checklist, not a measured queue-time study.
Which NIO network figure should readers use?
The September 28 partnership release separates China’s swap sites from charging sites. These are dated company-reported figures, not a live map or an independent operating audit.
Swipe sideways to read the date and counting boundary.
| Metric | Reported figure | Date and boundary |
|---|---|---|
| Power Swap Stations | 4,126 | China; September 27, 2026 snapshot |
| Charging stations | 5,307 | China; same snapshot; not swap stations |
| Combined charging and swapping sites | 9,433 | China; do not relabel the combined total as swap sites |
| Cumulative battery swaps | More than 125 million | Company total in the September release; no country breakdown supplied |
The distinction matters for a buyer: a charging location is not automatically a place that can exchange the vehicle’s pack. Equally, a national site count does not identify the working stations near a home, workplace or travel route. The cited disclosure does not supply site-level uptime, queue lengths, charged-pack availability or profitability.
Keep geography consistent when comparing older milestones. The February 6, 2026 release reported 3,790 stations worldwide and 100 million swaps. The September China-only station figure cannot be subtracted from that worldwide figure to calculate how many stations were built between the two dates. A comparable geographic series is needed first.
Does the Geely agreement make its cars swap-compatible?
Not by itself. NIO’s September 27 investor release describes definitive agreements subject to regulatory clearances and other closing conditions. It also calls vehicle-adoption and service plans preliminary, with implementation requiring further discussion.
The proposed NIO Power transaction combines Geely’s Yiyi business interest with RMB 640 million cash. The disclosed post-completion structure gives the Geely subsidiary 30% and NIO China a controlling 63.6%. Those are conditional ownership terms for the energy business, not proof that Geely already owns that stake or that it owns 30% of NIO’s vehicle company. A separate proposed investment would give NIO China 10% of charging business Haohan Energy after completion.
For drivers, the useful distinction is between cooperation, a compatible production vehicle and an available local service. Before purchasing, obtain confirmation of the exact model and pack, the stations it can use, the activation requirements and the applicable service terms. A shared payment account or charging-network connection does not establish mechanical battery compatibility.
For the wider ecosystem, see our Huawei–CATL and Geely–NIO alliance comparison. CATL’s separate network is tracked in the Chocolate Swap owner; its figures and vehicle lists should not be merged into NIO’s.
What does firefly’s 60 kWh battery change for swapping?
firefly’s larger battery adds a capacity choice and a permanent-upgrade option, not universal access to every NIO-branded station. Three separate checks matter: whether the car accepts the pack, whether a particular station can serve that car, and whether the customer’s subscription or purchase terms cover the requested service.
In its October 23, 2026 release, firefly introduced a 60 kWh NCM battery with a claimed range of up to 560 km on the Chinese CLTC cycle. The manufacturer also retained the 42 kWh standard-range option and said existing users could permanently upgrade. The release supports the upgrade-ready vehicle design; it does not establish a temporary-rental offer, a particular customer’s upgrade fee or availability outside China. CLTC is a test-cycle result, not a promise of motorway range.
The relevant station milestone came earlier. firefly’s August 7 announcement states that NIO Power Swap Station 5.0 supports NIO, ONVO and firefly models. Its first batch covered seven Chinese cities. That is a fifth-generation station compatibility statement, not evidence that older stations were converted or that every site has every battery capacity ready.
A later firefly release dated October 16 reports that 101 fifth-generation stations supported firefly as of October 14, across 55 cities in 24 Chinese provinces. This is a historical service subset, not November’s total for NIO Power and not a count of all stations available to other brands.
Before paying for an upgrade or planning a longer trip
- Confirm the transaction: ask whether the offer permanently changes the battery entitlement or temporarily reserves a larger pack. Get the eligibility, return obligations and any subscription change in writing; the October announcement alone does not supply those terms.
- Check the route in the current app: select stations explicitly available to firefly and confirm service hours and the requested pack. A compatible station design is not a live inventory or queue forecast.
- Keep range and charging separate: a higher-capacity pack may extend driving distance, but it does not by itself prove a higher charging rate, a shorter wait or a lower journey cost. Allow for speed, temperature and a charging alternative.
These checks make the general BaaS comparison below more concrete. A vehicle upgrade, a station-generation rollout and the Geely transaction each change a different part of the system; none can substitute for the others.
What should a BaaS buyer compare?
NIO’s August 20, 2020 BaaS launch release explains the underlying separation of vehicle purchase and battery subscription. It supports the business-model definition, not a current price quotation. Historical fees and discounts from that launch are deliberately not presented as November 2026 offers.
Compare like with like. Put the vehicle payment and battery subscription in separate lines; use the same planned ownership period for both a BaaS quotation and an outright-purchase quotation. Then ask the seller or operator to document these points:
- Recurring cost: current battery fee, included services and any separately charged swaps or energy.
- Access: the exact vehicle, pack and station combination supported in the intended market.
- Changes: whether temporary upgrades, permanent changes or cancellation are offered under that particular contract.
- Exit: how a sale, transfer or early termination affects the battery arrangement and any settlement due.
This checklist does not promise that any particular benefit or contract option is available. No current subscription tariff, universal free-swap allowance or resale value has been verified here. Get the actual local written terms rather than treating a lower advertised vehicle price as the entire cost.
What remains unknown?
The reviewed releases do not settle current November network totals, transaction closing, a universal NIO/ONVO/firefly/Geely compatibility matrix or individual-station economics. Company announcements cannot replace an operator’s current vehicle/site confirmation. Nor do they independently prove that swapping is always quicker or cheaper than charging for a particular driver.
The company-and-founder story remains on NIO and William Li. This URL stays the practical owner for the swap process, BaaS and compatibility boundaries; a continuing network announcement does not need another same-intent page.
Frequently asked questions
How long does a NIO battery swap take?
NIO advertises a three-minute fully automatic process from ready-for-power-swap mode until self-check finishes. That is not a guarantee for the complete visit, including travel, arrival or waiting.
How many NIO swap stations does the September release report?
NIO’s September 28, 2026 release reports 4,126 Power Swap Stations in China using a September 27 snapshot. The 9,433 combined total also includes charging sites and must not be called a swap-station count.
Does the Geely partnership mean all Geely cars can swap at NIO stations?
No. The cited investor release describes preliminary adoption and service plans requiring further discussion. It does not establish universal vehicle compatibility or current customer access.
Does BaaS make the battery free?
No. BaaS separates the vehicle purchase from a battery subscription. Compare the current local vehicle quotation, recurring fees and service terms over the same ownership period.
Is Geely’s 30% NIO Power stake confirmed as completed?
Not by the sources reviewed here. The September 27 announcement makes the transaction subject to regulatory clearances and other closing conditions. Its post-completion percentages are not themselves closing evidence.
Can every NIO, ONVO or firefly use every NIO station?
Do not assume so. The sources reviewed do not provide a universal current compatibility matrix. Confirm the particular vehicle, battery, station and local service terms with the operator before relying on access.
Source check: NIO Power product page; NIO’s September 28 network/partnership release; September 27 investor disclosure; February 6, 2026 milestone release; and August 20, 2020 BaaS launch explanation, linked above. Reviewed November 1, 2026. Dated historical releases are not relabelled as new announcements; practical buyer checks are BYDToday’s editorial analysis.


